Property details
Postcode, property type, roof information and any access considerations.
How it works
A clear five-stage route from property assessment and system design through installation, commissioning and long-term support.
The exact sequence and timescale depend on the property, selected equipment, survey findings and any network or access requirements.
Before the technical visit
REST starts by understanding the property, the reason for considering solar and any future plans that could affect the design. This allows the technical assessment to focus on the options that are most relevant.
Postcode, property type, roof information and any access considerations.
Recent bills, tariff information and when electricity is normally used.
Battery interest, expected usage changes and any planned electrical upgrades.
The REST installation process
Each stage should answer a different question: what fits, what should be designed, how it will be installed, whether it is working correctly and how it will be supported afterwards.
Home roof assessment
The first technical stage is understanding the roof, the electrical installation and the way electricity is used at the property.
You receive a clearer view of what can realistically be installed and which options should move forward to design.
System design
REST models the system around available roof space, electricity demand and the equipment route being considered.
The proposal should explain the recommended equipment, expected performance and why the design suits the property.
Installation
Once the proposal, survey findings and contract are agreed, REST coordinates the installation around the property and selected system.
The physical system is installed to the approved design, ready for testing and commissioning.
Commissioning
Commissioning verifies that the installed equipment is operating correctly and that the customer understands the main controls and monitoring tools.
The system is switched on, tested and documented, with the relevant certification process started or completed.
Aftercare
REST provides a route for technical support, warranty coordination and ongoing system care after the installation has been completed.
You have a clear support route for system questions, documentation and qualifying warranty or maintenance needs.
What the assessment covers
A proper review considers the building, electrical infrastructure, usage profile and practical installation route together.
Dimensions, orientation, pitch, condition, access and the usable area for the proposed array.
Trees, nearby buildings, roof features and other factors that may reduce usable generation.
Meter, consumer unit, earthing, cable routes and suitable locations for the inverter or battery.
Annual consumption, daytime usage, tariff structure and how stored or exported electricity may be used.
What you should receive
The final documents depend on the project and equipment, but the handover should leave you with enough information to understand the system, operate the monitoring and follow the relevant support route.
Equipment specification, layout, assumptions and estimated performance.
Testing, setup information and qualifying certification documents.
Manufacturer terms, installer cover and the route for making a qualifying claim.
App access, system guidance and contact details for future support.
Document names, certification timing and warranty coverage vary by system. Your quotation, contract and handover pack should confirm exactly what applies.
Planning the programme
Not every property follows the same programme. Identifying the practical constraints early helps reduce avoidable delays later.
Detailed measurements or electrical findings can require the original concept to be adjusted.
Repairs, scaffolding restrictions or unusual access requirements may need to be resolved first.
Some systems require additional electricity-network review or approval before commissioning.
Selected products, stock availability and suitable internet access can influence setup and handover.
Installation questions
These answers cover the common parts of the REST process. The specific proposal and survey findings determine what applies to an individual property.
The timescale depends on the property, survey findings, equipment availability, scaffolding, network requirements and the system being installed. REST will confirm the expected programme after the technical review and design stage.
Access may be needed to the meter, consumer unit, loft or proposed equipment locations. REST will explain what access is required when the assessment is arranged.
The final technical design can change after the property assessment, electrical checks or detailed roof measurements. Any material design change should be explained before installation proceeds.
REST will explain any visible concerns identified during the assessment. Roofing work may need to be completed before the solar installation, depending on the condition of the roof and the proposed mounting area.
Certification is completed after the qualifying installation has been commissioned and the required documents have been processed. REST can explain the expected documentation timeline for the specific project.
Yes, where the property, electrical setup and selected equipment support it. Battery capacity and operating strategy should be designed around household demand, tariffs and future energy plans.
REST provides support for system questions, compatible monitoring, warranty coordination and optional maintenance services. The exact warranty and support route depends on the installed products and contract.
Start your REST journey
Share the postcode and a few project details. The REST team can explain the most appropriate next step before arranging a technical assessment.