Get a Free Quote

Smart Export Guarantee

Get paid for the solar power you do not use.

Generate clean electricity, use what the property needs and export eligible surplus energy through a tariff offered by a Smart Export Guarantee supplier.

Export payments are arranged with the chosen SEG supplier. Rates, eligibility and contract terms vary, and income is not guaranteed.

Generate solar electricity
Use household demand first
Export the measured surplus
Receive supplier payments

How SEG works

From the roof to your supplier's export payment.

The property uses solar generation first. Electricity that is not used or stored can be measured as export and paid under the chosen supplier tariff.

01

Panels generate

The solar array produces electricity from available daylight.

02

The property uses power

Current household demand is normally supplied before surplus electricity is exported.

03

Export is measured

An appropriate smart or export meter records the electricity sent to the grid.

04

The supplier pays

The SEG supplier applies its tariff to the eligible metered export readings.

Solar export flow

See surplus solar travel back to the grid.

The property uses the electricity it needs first. Once that demand has been met, the animated route follows the remaining solar energy through the inverter and out to the grid.

Export to grid
Diagram of a solar home exporting surplus electricity to the grid
InverterRouting surplus energy
SolarGenerating electricity
HomeDemand met first
GridWaiting for surplus

Illustrative example only. Actual generation, self-consumption, export volume and income depend on the final system design, roof conditions, weather, household demand, battery settings, export limits, meter data and the supplier tariff. The example rate is not a current tariff quote or guarantee.

The certification gateway

Build the evidence your SEG supplier will ask for.

For a typical domestic system, the application route usually depends on suitable installation certification, an export-capable meter and the system information requested by the supplier.

  • REST provides the MCS certificate for the completed qualifying installation
  • REST completes the applicable G98 or G99 DNO process
  • The customer confirms the supplier's meter and application requirements
  • The customer selects and applies for the preferred SEG tariff

Typical application route

  1. 01Receive the installation certificate and system handover documents.
  2. 02Confirm a suitable smart or export meter is recording export.
  3. 03Compare current supplier tariffs and their qualifying conditions.
  4. 04Apply directly to the selected SEG supplier and provide the requested evidence.

Choosing an export tariff

Compare the complete tariff, not only the headline rate.

SEG suppliers set their own rates, contract lengths and eligibility conditions. A higher advertised rate may come with additional requirements.

Export rate

Check the payment per exported kilowatt hour and whether the rate is fixed, variable or time-based.

Contract length

Confirm whether the tariff has a fixed end date, rolls on or can be changed after notice.

Supplier conditions

Some tariffs may require the customer to import electricity from the same supplier or use particular equipment.

Battery export rules

Confirm whether the tariff permits exported battery energy and whether charging-source rules apply.

Rates change regularly. Always confirm the current tariff, terms and eligibility directly with the supplier before relying on an earnings estimate.

Track generation and export

See when the system is sending power back to the grid.

Compatible monitoring can show solar generation, household demand, battery state of charge and export activity. The supplier's meter remains the basis for SEG payments.

Live energy flow

See how current generation is divided between the property, battery and grid.

App-based visibility

Review compatible system data without relying on estimated export alone.

Duracell Energy app showing home generation and energy flow

Accredited and independently verifiable

The standards and protection behind the installation.

REST combines recognised installation certification, consumer protection, proposal validation and regulated finance permissions.

Microgeneration Certification Scheme

MCS

Recognised certification evidence for qualifying small-scale renewable installations.

HIES accredited member

HIES

Independent consumer-protection framework for qualifying home-energy installations.

Energy Performance Validation Scheme

EPVS

Independent validation of proposal assumptions and estimated system performance.

Renewable Energy Consumer Code

RECC

Consumer-service standards for businesses selling or installing small-scale renewables.

Financial Conduct Authority

FCA

REST UK is authorised and regulated for applicable consumer-credit activities.

Smart Export Guarantee questions

Understand certification, metering and supplier applications.

REST prepares the solar installation and supporting documents. The SEG agreement and export payments are provided by the customer's chosen supplier.

The Smart Export Guarantee is a supplier-led scheme that pays eligible small-scale generators for electricity exported to the grid. The export tariff, contract length and payment terms are set by the chosen SEG supplier.

Plan an export-ready solar system

Tell REST where you are starting from.

Share the property, solar and meter details so REST can review the appropriate installation or upgrade route.

This form sends an enquiry to REST UK. It does not apply for an SEG tariff or guarantee export payments.